The CK-RPL8 carries parts on plating racks instead of loose in a barrel. A travelling gantry lifts each rack out of one tank and lowers it into the next in a programmed sequence, so every rack gets the same dwell time in every tank — the deposit thickness is set by the recipe, not by how fast the operator walks.
Racking is what you gain: flat and polished parts keep their A-class face free of tumble marks, holloware and long components stay undistorted, and only the small area touched by the rack contacts carries a mark. The tanks are welded from 20 – 25 mm polypropylene sheet inside a steel frame, with copper cathode bars along the rim and PVC-covered solution piping between stations.
Built for
- Jewellery and holloware where the visible face must stay unmarked — pendants, bangles, rings, small trays
- Bathroom and sanitary fittings, door hardware and long extruded profiles
- Flat plates, nameplates and stamped panels that would scratch each other in a barrel
- Parts with a mirror-polished surface that must stay polished after plating
- Zinc, nickel, copper, tin and gold processes on steel, brass, zinc alloy and ABS
- Production runs where the same rack is plated again and again, with repeatable thickness
Main parameters
| Model | CK-RPL8 automatic rack plating line |
|---|---|
| Process stations | 8 tanks in one row — degrease, rinse, acid, rinse, plating, recovery, rinse, hot rinse (layout built to your process) |
| Tank size | 1,200 × 700 × 800 mm internal, per station |
| Tank material | Welded polypropylene 20 – 25 mm, steel frame and external ribs |
| Overall size | Approx. 8,000 × 2,500 × 3,200 mm (L × W × H) |
| Gantry | Overhead single-beam gantry with 2 travelling hoists |
| Hoist load | 150 kg per hoist; lifting 6 m/min, traverse 20 m/min, VFD controlled |
| Rack size | Up to 900 × 600 × 400 mm, 80 kg of parts per rack |
| Cathode bar | Hard copper 10 × 80 mm; titanium anode bar 10 × 40 mm with hooks |
| Rectifier | 1,000 A / 12 V IGBT per plating tank, air or water cooled |
| Heating | PTFE or titanium heat exchanger, 20 – 70 °C, PID control ±1 °C |
| Filtration | Cartridge filter 10 m³/h per plating tank, magnetic pump |
| Exhaust | Lateral suction with hood, approx. 6,000 m³/h, PP or PVC duct |
| Control | PLC with 10 in colour touch screen; a sequence recipe per rack type, with dwell time per tank |
| Power supply | 380 V / 3 phase / 50 Hz, approx. 45 kW installed |
| Compressed air | 0.6 MPa dry air, 300 L/min |
| Net weight | Approx. 3,500 kg |
| Lead time | 45 – 60 days |
Why buyers choose this line
- Recipe-driven hoist sequence — thickness repeatability from rack to rack, shift to shift
- Two hoists on one gantry: one rack in the plating tank while the other is transferred, so the rectifier is never idle
- No tumble marks on the A-class face, and no racking of small parts into barrels
- Welded 20 – 25 mm PP tanks in a steel frame: no lined steel tanks, no re-lining, no seam leaks
- Every tank has its own drain valve, overflow weir and solution piping, so baths are changed without dismantling the line
- Stations are added in modules — start with 6 tanks and extend to 12 on the same gantry beam
Turnkey delivery
The line is supplied as a working process, not a set of tanks:
- Process layout (tank sequence, dwell times, rack pitch) drawn to your part and output per shift
- Rectifier, heat exchanger, filter and exhaust sized to the bath chemistry and coating thickness
- Trial plating of your samples before shipment, with coating thickness and adhesion report
- Installation and commissioning on site, plus operator training on the PLC recipes
- Spare racks, bar clamps, heater elements and a set of wearing parts shipped with the line
Related machines
barrel plating line for high volumes of small parts that can tumble · magnetic polishing machine for deburring and brightening parts before they go on the rack
Ask for a quotation
Send us the part drawing or a photo, the base material, the coating you need and your output per shift. We will reply with the tank sequence, the rack layout and a delivery schedule — usually within one working day.

