
Three levels of package, depending on whether you are starting a workshop, adding a process or replacing a full line. Each one includes the machines, the moulds and the people who set them up.
Package levels
For a new workshop producing a limited range of small zinc or low-melting alloy parts.
Typical lead time: 30–45 days
For an established factory adding casting plus finishing in one flow.
Typical lead time: 45–70 days
For investors building a full facility from empty floor to finished, plated product.
Typical lead time: 90 days and above
By product type
The right machine depends less on tonnage than on the part: wall thickness, surface requirement, annual volume and finishing. These are the four configurations we build most often.

What is included
Every quotation states exactly what is shipped, who installs it, who trains the operators and what happens after the warranty ends.
Equipment specified to your part, with electrical standard matched to your country.
Dies and rubber moulds made to drawing, with trial samples before shipment.
Assembly, levelling, utility connection and first production run, on site or by video.
Operators and maintenance staff trained on settings, safety and troubleshooting.
Spare parts, consumables and technical answers for the life of the machine.
Tell us what you want to produce and your target output. We reply within one working day.